The first steps for the installation of the pilot plants in Almería have already been carried out
The tasks began on the first days of February at the Alboloduy plant, by installing a supporting basis for the raw water tank.
And they continued with the “Garage Control” of the six filters (two filters for each plant)…
… and the installation of the two granular filters and the raw water tank at the Alboloduy pilot plant.
We keep going on!!!!