Dec 13, 2017 | News
Isabel Rodríguez from Diputación de Almería presentated LIFE Alchemia project in Partenalia European Session “Exchange of good practices and experiences related to sustainability and the Covenant of Mayors for Climate and Energy” organized by Diputación de Sevilla...
Dec 11, 2017 | News
Within the preparatory action A4: Optimizing the operation conditions for the HMO technology (Estonian Demo), the construction of a lab-scale prototype has been carried out at the Tallinn University of Technology. First trials for the optimization and demonstration of...
Dec 5, 2017 | News
Diputación de Almería has adapted the DWTP of Fiñana. To do this, it has carried out a refining treatment using zeolites in ETAP for the waters of Barranco del Rosal regulated by El Castañar dam. Networking, control assembly adaptation DWTP of FiñanaNetworking,...
Nov 23, 2017 | News
Diputación de Almería was represented by Javier Martínez at the ‘Smart Water 2017’ conference held in Alicante, presenting his water management model of Telemando as an efficient proposal in the management of municipal waters, as well as talking about the...
Nov 6, 2017 | News
Within the A3 preparatory action, the data collection tasks for the Spanish pilot plants design in Almería continue in Tahal.
Nov 3, 2017 | News
Beginning the necessary field works for the design of one of the pilot plants in Benizalón in Almería (Spain), which will be based on filter beds. These works are part of the preparatory action A3: Selection of catalatic filter media. Link: Project actions Fieldwork...